Decisions on Provisional Measures
Case name | Decision (language(s)) | Date of decision | Finding on provisional measures (including subsequent source) |
Holiday Inns S.A. and others v. Morocco (ICSID Case No. ARB/72/1) | Decision of the Tribunal (English & French) | July 2, 1972 | _ |
AGIP S.p.A. v. People's Republic of the Congo (ICSID Case No. ARB/77/1) | Decision of the Tribunal (French) | January 18, 1978 | _ |
Amco Asia Corporation and others v. Republic of Indonesia (ICSID Case No. ARB/81/1) | Decision on Request for Provisional Measures (English) | December 9, 1983 | Rejected (see Decision on Jurisdiction) |
Atlantic Triton Company Limited v. People’s Revolutionary Republic of Guinea (ICSID Case No. ARB/84/1) | Decision on Provisional Measures (French) | December 18, 1984 | _ |
Maritime International Nominees Establishment (MINE) v. Republic of Guinea (ICSID Case No. ARB/84/4) | Decision on Provisional Measures (English) | December 4, 1985 | _ |
Ghaith R. Pharaon v. Republic of Tunisia (ICSID Case No. ARB/86/1) | Recommendation and Order on Claimant's Motion Pursuant to Articles 47 and 26 and Rule 39 (French) | May 22, 1987 | _ |
Ghaith R. Pharaon v. Republic of Tunisia (ICSID Case No. ARB/86/1) | Recommendation and Order on Claimant's Motion Pursuant to Articles 47 and 26 and Rule 39 (French) | July 7, 1988 | _ |
Mobil Oil Corporation and others v. New Zealand (ICSID Case No. ARB/87/2) | Ruling of Tribunal (English) | December 21, 1989 | _ |
Manufacturers Hanover Trust Company v. Arab Republic of Egypt and General Authority for Investment and Free Zones (ICSID Case No. ARB/89/1) | Decision No. 1 (English) | September 5, 1990 | _ |
Manufacturers Hanover Trust Company v. Arab Republic of Egypt and General Authority for Investment and Free Zones (ICSID Case No. ARB/89/1) | Decision No. 2 (English) | September 5, 1990 | _ |
Manufacturers Hanover Trust Company v. Arab Republic of Egypt and General Authority for Investment and Free Zones (ICSID Case No. ARB/89/1) | Decision No. 3 (English) | December 12, 1990 | _ |
Manufacturers Hanover Trust Company v. Arab Republic of Egypt and General Authority for Investment and Free Zones (ICSID Case No. ARB/89/1) | Decision No. 4 (English) | December 12, 1990 | _ |
Manufacturers Hanover Trust Company v. Arab Republic of Egypt and General Authority for Investment and Free Zones (ICSID Case No. ARB/89/1) | Decision on Jurisdiction and the Constitution of the Arbitral Tribunal and on Recommendation of Provisional Measures (English) | May 28, 1991 | _ |
Vacuum Salt Products Ltd. v. Republic of Ghana (ICSID Case No. ARB/92/1) | Decision on Provisional Measures (English) | December 3, 1992 | Rejected (see Award) |
Vacuum Salt Products Ltd. v. Republic of Ghana (ICSID Case No. ARB/92/1) | Decision on Provisional Measures (English) | June 14, 1993 | Rejected (see Award) |
Compañia del Desarrollo de Santa Elena S.A. v. Republic of Costa Rica (ICSID Case No. ARB/96/1) | Request for Provisional Measures (English) | May 10, 1999 | Rejected (see Final Award) |
Československa Obchodní Banka, a.s. (CSOB) v. Slovak Republic (ICSID Case No. ARB/97/4) | Procedural Order No. 2 (English) | September 9, 1998 | Rejected |
Československa Obchodní Banka, a.s. (CSOB) v. Slovak Republic (ICSID Case No. ARB/97/4) | Procedural Order No. 3 (English) | November 5, 1998 | Rejected |
Československa Obchodní Banka, a.s. (CSOB) v. Slovak Republic (ICSID Case No. ARB/97/4) | Procedural Order No. 4 (English) | January 11, 1999 | Granted |
Československa Obchodní Banka, a.s. (CSOB) v. Slovak Republic (ICSID Case No. ARB/97/4) | Procedural Order No. 5 (English) | March 1, 2000 | Granted |
Emilio Agustín Maffezini v. Kingdom of Spain (ICSID Case No. ARB/97/7) | Procedural Order No. 2 (Spanish) | October 28, 1999 | Rejected |
Compagnie Française pour le Développement des Fibres Textiles v. Côte d'Ivoire (ICSID Case No. ARB/97/8) | Decision of the Arbitral Tribunal (French) | June 25, 1998 | _ |
Joseph C. Lemire v. Ukraine (ICSID Case No. ARB(AF)/98/1) | Decision on Provisional Measures (English) | January 22, 1999 | Rejected (see Award) |
Víctor Pey Casado and President Allende Foundation v. Republic of Chile, (ICSID Case No. ARB/98/2) | Decision on Provisional Measures (French & Spanish) | September 25, 2001 | Rejected |
Víctor Pey Casado and President Allende Foundation v. Republic of Chile, (ICSID Case No. ARB/98/2) | Decision on Provisional Measures (French) | November 5, 2001 | Rejected (see Decision) |
Banro American Resources, Inc. and Société Aurifère du Kivu et du Maniema S.A.R.L. v. Democratic Republic of the Congo (ICSID Case No. ARB/98/7) | Decision Concerning the Request for Provisional Measures (English) | July 23, 1999 | Rejected (see Award) |
Tanzania Electric Supply Company Limited v. Independent Power Tanzania Limited (ICSID Case No. ARB/98/8) | Decision on the Respondent's Request for Provisional Measures (English) | December 20, 1999 | Rejected |
Marvin Roy Feldman Karpa v. United Mexican States (ICSID Case No. ARB(AF)/99/1) | Procedural Order No. 2 (English & Spanish) | May 3, 2000 | Rejected (see Award) |
Zhinvali Development Ltd. v. Republic of Georgia (ICSID Case No. ARB/00/1) | Recommendation and Order on Claimant's Motion Pursuant to Articles 47 and 26 and Rule 39 (English) | January 24, 2002 | _ |
World Duty Free Company Limited v. Republic of Kenya (ICSID Case No. ARB/00/7) | Decision on a Request by the Respondent for a Recommendation of Provisional Measures (English) | April 25, 2001 | Rejected (see Award) |
World Duty Free Company Limited v. Republic of Kenya (ICSID Case No. ARB/00/7) | Procedural Order (English) | January 31, 2005 | Rejected (see Award) |
AES Summit Generation Limited v. Republic of Hungary (ICSID Case No. ARB/01/4) | Procedural Order No. 1 Concerning the Request for Provisional Measures (English) | October 24, 2001 | _ |
Azurix Corp. v. Argentina (ICSID Case No. ARB/01/12) | Decision on Provisional Measures requested by the Claimant (English & Spanish) | August 6, 2002 | Rejected (see Decision on Jurisdiction) |
SGS Société Générale de Surveillance S.A. v. Islamic Republic of Pakistan (ICSID Case No. ARB/01/13) | Procedural Order No. 2 (English) | October 16, 2002 | Partial |
JacobsGibb Limited v. Hashemite Kingdom of Jordan (ICSID Case No. ARB/02/12) | Decision on Claimant's Request for Provisional Measures (English) | September 17, 2003 | _ |
Ahmonseto, Inc. and others v. Arab Republic of Egypt (ICSID Case No. ARB/02/15) | Procedural Order No. 2 on Provisional Measures (English) | October 10, 2003 | _ |
Sempra Energy International v. Argentine Republic (ICSID Case No. ARB/02/16); Camuzzi International S.A. v. Argentine Republic (ICSID Case No. ARB/03/2) (both cases together) | Letter of January 16, 2006 (English & Spanish) | January 16, 2006 | Granted (see Award) |
Tokios Tokelés v. Ukraine (ICSID Case No. ARB/02/18) | Procedural Order No. 1: Claimant's Request for Provisional Measures (English) | July 1, 2003 | Granted |
Tokios Tokelés v. Ukraine (ICSID Case No. ARB/02/18) | Procedural Order No. 3 (English) | January 18, 2005 | Rejected |
Plama Consortium Limited v. Republic of Bulgaria (ICSID Case No. ARB/03/24) | Order (English) | September 6, 2005 | Rejected |
Plama Consortium Limited v. Republic of Bulgaria (ICSID Case No. ARB/03/24) | Procedural Order No. 9 (English) | February 28, 2007 | Rejected (see Award) |
Inceysa Vallisoletana S.L. v. Republic of El Salvador (ICSID Case No. ARB/03/26) | Award (English & Spanish) | August 2, 2006 | Rejected (see Award) |
Bayindir Insaat Turizm Ticaret Ve Sanayi A.S. v. Islamic Republic of Pakistan (ICSID Case No. ARB/03/29) | Procedural Order No. 1 - Decision on Claimant's Request for Provisional Measures (English) | November 29, 2004 | Partial (see Decision on Jurisdiction) |
Bayindir Insaat Turizm Ticaret Ve Sanayi A.S. v. Islamic Republic of Pakistan (ICSID Case No. ARB/03/29) | Procedural Order No. 11 on Respondent's Requests for Provisional Measures (English) | April 14, 2008 | Partial (see Award) |
Bayindir Insaat Turizm Ticaret Ve Sanayi A.S. v. Islamic Republic of Pakistan (ICSID Case No. ARB/03/29) | Procedural Order No. 12 on Claimant's Requests for Provisional Measures (English) | April 14, 2008 | Rejected (see Award) |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Procedural Order No. 4 (French) | August 29, 2008 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Letter to the Parties (French) | September 30, 2008 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Letter to the Parties (French) | December 24, 2008 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Procedural Order No. 5 (French) | November 17, 2010 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Decision on Provisional Measures (French) | April 17, 2014 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Decision on Provisional Measures (French) | March 7, 2016 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Decision on Provisional Measures (French) | April 19, 2017 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Procedural Order No. 9 (French) | October 4, 2019 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Procedural Order No. 10 (French) | October 8, 2019 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Procedural Order No. 11 (French) | October 17, 2019 | _ |
ABCI Investments Limited v. Republic of Tunisia (ICSID Case No. ARB/04/12) | Procedural Order No. 17 (French) | April 1, 2022 | _ |
Saipem S.p.A. v. People's Republic of Bangladesh, (ICSID Case No. ARB/05/7) | Decision on Jurisdiction and Recommendation on Provisional Measures (English) | March 21, 2007 | Granted |
EDF (Services) Limited v. Romania (ICSID Case No. ARB/05/13) | Procedural Order No. 2 (English) | May 30, 2008 | Partial (see Award) |
RSM Production Corporation and others v. Grenada (ICSID Case No. ARB/05/14) | Procedural Order (English) | December 21, 2006 | _ |
RSM Production Corporation and others v. Grenada (ICSID Case No. ARB/05/14) | Procedural Order (English) | May 9, 2007 | _ |
RSM Production Corporation and others v. Grenada (ICSID Case No. ARB/05/14) | Procedural Order (English) | May 14, 2007 | _ |
RSM Production Corporation and others v. Grenada (ICSID Case No. ARB/05/14) | Procedural Order (English) | August 2, 2007 | _ |
Helnan International Hotels A/S v. Arab Republic of Egypt (ICSID Case No. ARB/05/19) | Decision on Claimant's Request for Provisional Measures (English) | May 17, 2006 | Rejected |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/05/20) | Procedural Order (English) | November 5, 2010 | Rejected (see Final Award) |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/05/20) | Decision on Claimants' Application for Provisional Measures (English) | March 2, 2011 | Partial (see Final Award) |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/05/20) | Supplemental Decision on Provisional Measures (English) | May 27, 2011 | Not Decided (see Final Award) |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/05/20) | Temporary Order on Garnishment (English) | November 23, 2011 | Granted (see Final Award) |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/05/20) | Third Decision on Provisional Measures (English) | December 16, 2011 | Granted (see Final Award) |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/05/20) | Fourth Decision on Provisional Measures (English) | March 27, 2013 | Partial/Rejected (see Final Award) |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/05/20) | Fifth Decision on Provisional Measures (English) | April 5, 2013 | Rejected (see Final Award) |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/05/20) | Decision on the Request for Provisional Measures Filed by the Respondents on Annulment (English) | August 18, 2014 | Rejected (see Decision on Annulment) |
Biwater Gauff (Tanzania) Limited v. United Republic of Tanzania (ICSID Case No. ARB/05/22) | Procedural Order No. 3 (English) | March 31, 2006 | Granted |
Biwater Gauff (Tanzania) Limited v. United Republic of Tanzania (ICSID Case No. ARB/05/22) | Procedural Order No. 3 (English) | September 29, 2006 | Rejected |
Spyridon Roussalis v. Romania (ICSID Case No. ARB/06/01) | Decision on Provisional Measures (English) | July 22, 2008 | Granted (see Award) |
Spyridon Roussalis v. Romania (ICSID Case No. ARB/06/01) | Decision on Provisional Measures (English) | July 2, 2009 | Partial (see Award) |
Quiborax S.A., Non-Metallic Minerals S.A. & Allan Fosk Kaplún v. Plurinational State of Bolivia (ICSID Case No. ARB/06/2) | Decision on Provisional Measures (English & Spanish) | February 26, 2010 | Partial |
Cementownia “Nowa Huta” S.A. v. Republic of Turkey (ICSID Case No. ARB(AF)/06/2) | Procedural Order No. 1 (English) | January 25, 2008 | Rejected (see Award) |
Phoenix Action, Ltd. v. Czech Republic, (ICSID Case No. ARB/06/5) | Decision on Provisional Measures (English) | April 6, 2007 | Rejected |
Togo Electricité and GDF-Suez Energie Services v. Republic of Togo (ICSID Case No. ARB/06/7) | Procedural Order (French) | April 13, 2007 | Not Decided (see Award) |
Togo Electricité and GDF-Suez Energie Services v. Republic of Togo (ICSID Case No. ARB/06/7) | Procedural Order (French) | October 26, 2007 | Rejected (see Award) |
Libananco Holdings Co. Limited v. Republic of Turkey (ICSID Case No. ARB/06/8) | Decision on Preliminary Issues (English) | June 23, 2008 | Rejected |
Libananco Holdings Co. Limited v. Republic of Turkey (ICSID Case No. ARB/06/8) - Annulment Proceedings | Decision on Applicant's Request for Provisional Measures (English) | May 7, 2012 | Rejected |
Chevron Bangladesh Block Twelve, Ltd. And Chevron Bangladesh Blocks Thirteen and Fourteen, Ltd. v. People's Republic of Bangladesh (ICSID Case No. ARB/06/10) | Procedural Order No. 1 (English) | April 14, 2007 | _ |
Occidental Petroleum Corporation and Occidental Exploration and Production Company v. Republic of Ecuador (ICSID Case No. ARB/06/11) | Decision on Provisional Measures (English & Spanish) | August 17, 2007 | Rejected |
Azpetetrol International Holdings B.V., Azpetrol Group B.V. and Azpetrol Oil Services Group B.V. v. Republic of Azerbaijan (ICSID Case No. ARB/06/15) | Procedural Order No. 5 (English) | October 6, 2008 | _ |
Barmek Holding A.S. v. Republic of Azerbaijan (ICSID Case No. ARB/06/16) | Decision on Provisional Measures (English) | September 9, 2007 | _ |
City Oriente Limited v. Republic of Ecuador and Empresa Estatal Petróleos del Ecuador (Petroecuador) (ICSID Case No. ARB/06/21) | Decision on Provisional Measures (English) | November 19, 2007 | _ |
City Oriente Limited v. Republic of Ecuador and Empresa Estatal Petróleos del Ecuador (Petroecuador) (ICSID Case No. ARB/06/21) | Decision on Revocation of Provisional Measures and Other Procedural Matters (Spanish) | May 13, 2008 | _ |
Europe Cement Investment and Trade S.A. v. Republic of Turkey (ICSID Case No. ARB(AF)/07/2) | Procedural Order No. 1 (English) | January 22, 2008 | Decision postponed (see Award) |
Europe Cement Investment and Trade S.A. v. Republic of Turkey (ICSID Case No. ARB(AF)/07/2) | Procedural Order No. 2 (English) | April 14, 2008 | Rejected (see Award) |
Europe Cement Investment and Trade S.A. v. Republic of Turkey (ICSID Case No. ARB(AF)/07/2) | Procedural Order No. 3 (English) | May 28, 2008 | Rejected (see Award) |
Europe Cement Investment and Trade S.A. v. Republic of Turkey (ICSID Case No. ARB(AF)/07/2) | Procedural Order No. 4 (English) | June 4, 2008 | Not decided (see Award) |
Alasdair Ross Anderson et al. v. Republic of Costa Rica (ICSID Case No. ARB(AF)/07/3) | Decision on Provisional Measures (English) | November 5, 2008 | Rejected (see Award) |
Abaclat and Others v. Argentine Republic (ICSID Case No. ARB/07/5) | Procedural Order No. 10 on Security for Costs (English & Spanish) | June 18, 2012 | Rejected |
Abaclat and Others v. Argentine Republic (ICSID Case No. ARB/07/5) | Procedural Order No. 11 (English & Spanish) | June 27, 2012 | Granted/Partial |
Saba Fakes v. Republic of Turkey (ICSID Case No. ARB/07/20) | Decision on Preliminary Issues (English) | October 1, 2008 | Rejected (see Award) |
Pantechniki S.A. Contractors & Engineers v. Republic of Albania (ICSID Case No. ARB/07/21) | Procedural Order No. 1 (English) | February 2, 2009 | Rejected (see Award) |
Railroad Development Corporation v. Republic of Guatemala (ICSID Case No. ARB/07/23) | Decision on Provisional Measures (English) | October 15, 2008 | Rejected |
Gustav F W Hamester GmbH & Co KG v. Republic of Ghana (ICSID Case No. ARB/07/24) | Procedural Order No. 3 on the Respondent's Request for Provisional Measures (English) | June 24, 2009 | Rejected (see Award) |
ATA Construction, Industrial and Trading Company v. Hashemite Kingdom of Jordan (ICSID Case No. ARB/08/2) | Procedural Order No. 1 (English) | October 14, 2010 | Not decided (see Award) |
ATA Construction, Industrial and Trading Company v. Hashemite Kingdom of Jordan (ICSID Case No. ARB/08/2) | Decision on Interpretation and on the Request for Provisional Measures (English) | March 7, 2011 | Not decided |
Burlington Resources, Inc. and others v. Republic of Ecuador (ICSID Case No. ARB/08/5) | Procedural Order No. 1 (English & Spanish) | June 29, 2009 | Granted |
Perenco Ecuador Limited v. Republic of Ecuador and Empresa Estatal Petróleos del Ecuador (Petroecuador), (ICSID Case No. ARB/08/6) | Decision on Provisional Measures (English & Spanish) | May 8, 2009 | Granted |
Repsol YPF Ecuador, S.A. and others v. Republic of Ecuador and Empresa Estatal Petróleos del Ecuador (PetroEcuador), (ICSID Case No. ARB/08/10) | Procedural Order No. 1 (Spanish) | June 17, 2009 | Granted |
Caratube International Oil Company LLP v. The Republic of Kazakhstan (ICSID ARB/08/12) | Decision Regarding Claimant's Application for Provisional Measures (English) | July 31, 2009 | Rejected |
CEMEX Caracas Investments B.V. and CEMEX Caracas II Investments B.V. v. Bolivarian Republic of Venezuela (ICSID Case No. ARB/08/15) | Decision on the Claimant's Request for Provisional Measures (English) | March 3, 2010 | Rejected |
Karmer Marble Tourism Construction Industry and Commerce Limited Liability Company v. Georgia (ICSID Case No. ARB/08/19) | Decision on Provisional Measures (English) | January 25, 2010 | _ |
Millicom International Operations B.V. and Sentel GSM SA v. The Republic of Senegal (ICSID Case No. ARB/08/20) | Decision on the Application for provisional measures submitted by the Claimants on 24 August 2009 (English & French) | December 9, 2009 | Granted |
Millicom International Operations B.V. and Sentel GSM SA v. The Republic of Senegal (ICSID Case No. ARB/08/20) | Decision on the Application for Provisional Measures submitted by the Claimants on 17 August 2010 (English & French) | October 29, 2010 | _ |
Teinver S.A., Transportes de Cercanías S.A. and Autobuses Urbanos del Sur S.A. v. Argentine Republic (ICSID Case No. ARB/09/1) | Procedural Order No. 2 (Decision on Jurisdiction) (English & Spanish) | April 29, 2011 | Rejected (see Decision on Jurisdiction) |
Teinver S.A., Transportes de Cercanías S.A. and Autobuses Urbanos del Sur S.A. v. Argentine Republic (ICSID Case No. ARB/09/1) | Procedural Order No. 4 (English & Spanish) | October 3, 2012 | Rejected (see Decision on Jurisdiction) |
Teinver S.A., Transportes de Cercanías S.A. and Autobuses Urbanos del Sur S.A. v. Argentine Republic (ICSID Case No. ARB/09/1) | Procedural Order No. 5 (English & Spanish) | October 3, 2012 | Partial (see Decision on Jurisdiction) |
Teinver S.A., Transportes de Cercanías S.A. and Autobuses Urbanos del Sur S.A. v. Argentine Republic (ICSID Case No. ARB/09/1) | Decision on Provisional Measures (English & Spanish) | April 8, 2016 | Partial |
Abengoa, S.A. y COFIDES, S.A. v. United Mexican States (ICSID Case No. ARB(AF)/09/2) | Procedural Order No. 3 (Spanish) | June 9, 2011 | Granted (see Award) |
Abengoa, S.A. y COFIDES, S.A. v. United Mexican States (ICSID Case No. ARB(AF)/09/2) | Decision on El Salvador's Application for Security for Costs (English) | July 13, 2011 | Granted (see Award) |
Commerce Group Corp. and San Sebastian Gold Mines, Inc. v. Republic of El Salvador (ICSID Case No. ARB/09/17) | Decision on El Salvador's Application for Security for Costs (English) | September 20, 2012 | Rejected |
David Minnotte and Robert Lewis v. Republic of Poland (ICSID Case No. ARB(AF)/10/1) | Decision on Provisional Measures and Procedural Order No. 1 (English) | February 23, 2012 | Rejected (see Award) |
Convial Callao S.A. and CCI - Compañía de Concesiones de Infrastructure S.A. v. Republic of Peru (ICSID Case No. ARB/10/2) | Procedural Order No. 1 (Spanish) | January 17, 2011 | Granted (see Final Award) |
Convial Callao S.A. and CCI - Compañía de Concesiones de Infrastructure S.A. v. Republic of Peru (ICSID Case No. ARB/10/2) | Decision on Application for Provisional Measures (Spanish) | February 22, 2011 | Rejected |
RSM Production Corporation and others v. Grenada (ICSID Case No. ARB/10/6) | Tribunal's Decision on Respondent's Application for Security for Costs (English) | October 14, 2010 | Rejected |
Niko Resources (Bangladesh) Ltd. v. Bangladesh Petroleum Exploration and Production Company Limited ("Bapex") and Bangladesh Oil Gas and Mineral Corporation ("Petrobangla") (ICSID Case Nos. ARB/10/11 and ARB/10/18) | Procedural Order No. 5 (English) | March 6, 2014 | Granted |
Niko Resources (Bangladesh) Ltd. v. Bangladesh Petroleum Exploration and Production Company Limited ("Bapex") and Bangladesh Oil Gas and Mineral Corporation ("Petrobangla") (ICSID Case Nos. ARB/10/11 and ARB/10/18) | Procedural Order No. 6 (English) | May 1, 2014 | Granted |
Hassan Awdi, Enterprise Business Consultants, Inc. and Alfa El Corporation v. Romania (ICSID Case No. ARB/10/13) | Decision on the Claimant´s further request on provisional measures | February 1, 2011 | Rejected (see the Award of the Tribunal) |
Hassan Awdi, Enterprise Business Consultants, Inc. and Alfa El Corporation v. Romania (ICSID Case No. ARB/10/13) | Procedural Order No. 1 - Decision on Provisional Measures (English) | March 29, 2011 | Rejected (see Award) |
Border Timbers Limited, Timber Products International (Private) Limited, and Hangani Development Co. (Private) Limited v. Republic of Zimbabwe (ICSID Case No. ARB/10/25); Bernhard von Pezold and others v. Republic of Zimbabwe (ICSID Case No. ARB/10/15) | Directions Concerning Claimants' Application for Provisional Measures of 12 June 2012 (English) | June 13, 2012 | Partial |
Border Timbers Limited, Timber Products International (Private) Limited, and Hangani Development Co. (Private) Limited v. Republic of Zimbabwe (ICSID Case No. ARB/10/25); Bernhard von Pezold and others v. Republic of Zimbabwe (ICSID Case No. ARB/10/15) | Procedural Order No. 4 (English) | March 16, 2013 | Rejected |
Border Timbers Limited, Timber Products International (Private) Limited, and Hangani Development Co. (Private) Limited v. Republic of Zimbabwe (ICSID Case No. ARB/10/25); Bernhard von Pezold and others v. Republic of Zimbabwe (ICSID Case No. ARB/10/15) | Procedural Order No. 5 (English) | April 3, 2013 | Granted |
Border Timbers Limited, Timber Products International (Private) Limited, and Hangani Development Co. (Private) Limited v. Republic of Zimbabwe (ICSID Case No. ARB/10/25); Bernhard von Pezold and others v. Republic of Zimbabwe (ICSID Case No. ARB/10/15) | Procedural Order No. 6 (English) | July 22, 2013 | Rejected |
Border Timbers Limited, Timber Products International (Private) Limited, and Hangani Development Co. (Private) Limited v. Republic of Zimbabwe (ICSID Case No. ARB/10/25); Bernhard von Pezold and others v. Republic of Zimbabwe (ICSID Case No. ARB/10/15) | Decision on Provisional Measures (English) | March 17, 2016 | _ |
Border Timbers Limited, Timber Products International (Private) Limited, and Hangani Development Co. (Private) Limited v. Republic of Zimbabwe (ICSID Case No. ARB/10/25); Bernhard von Pezold and others v. Republic of Zimbabwe (ICSID Case No. ARB/10/15) | Decision on the Applicant's Application for Provisional Measures to Exclude Consideration of the Merits in Part I (English) | October 13, 2016 | _ |
Border Timbers Limited, Timber Products International (Private) Limited, and Hangani Development Co. (Private) Limited v. Republic of Zimbabwe (ICSID Case No. ARB/10/25); Bernhard von Pezold and others v. Republic of Zimbabwe (ICSID Case No. ARB/10/15) | Decision on the Applicant's Urgent Application for Provisional Measures Regarding the Temporary Stay (English) | August 22, 2017 | |
Renée Rose Levy de Levi v. Republic of Peru (ICSID Case No. ARB/10/17) | Decision on Provisional Measures (English & Spanish) | June 17, 2011 | Rejected (see Award) |
Niko Resources (Bangladesh) Ltd. v. Bangladesh Petroleum Exploration and Production Company Limited ("Bapex") and Bangladesh Oil Gas and Mineral Corporation ("Petrobangla") (ICSID Case No. ARB/10/18) | Decision on Implementation of the Decision on the Payment Claim (English) | September 14, 2015 | Partial |
Niko Resources (Bangladesh) Ltd. v. Bangladesh Petroleum Exploration and Production Company Limited ("Bapex") and Bangladesh Oil Gas and Mineral Corporation ("Petrobangla") (ICSID Case No. ARB/10/18) | Decision Pertaining to the Exclusivity of the Tribunal´s Jurisdiction (English) | July 19, 2016 | Granted |
International Quantum Resources Limited, Frontier SPRL and Compagnie Minière de Sakania SPRL v. Democratic Republic of the Congo (ICSID Case No. ARB/10/21) | Procedural Order No. 1 (French) | July 1, 2011 | Partial |
International Quantum Resources Limited, Frontier SPRL and Compagnie Minière de Sakania SPRL v. Democratic Republic of the Congo (ICSID Case No. ARB/10/21) | Procedural Order No. 3 (French) | November 28, 2011 | Partial |
Highbury International AVV and Ramstein Trading Inc. v. Bolivarian Republic of Venezuela (ICSID Case No. ARB 11/1) | Procedural Order No. 3 (Spanish) | April 30, 2012 | Rejected (see Award) |
Agility for Public Warehousing Company K.S.C. v. Islamic Republic of Pakistan (ICSID Case No. ARB/11/8) | Procedural Order No. 1 (English) | January 30, 2012 | _ |
Rafat Ali Rizvi v. Republic of Indonesia (ICSID Case No. ARB/11/13) | Decision on Respondent's Application for the Security for Costs (English) | May 8, 2012 | Rejected (see Award on Jurisdiction) |
Hussain Sajwani, Damac Park Avenue for Real Estate Development S.A.E., and Damac Gamsha Bay for Development S.A.E. v. Arab Republic of Egypt (ICSID Case No. ARB/11/16) | Decision on Claimant's Request for Provisional Measures (English) | July 13, 2012 | _ |
Burimi SRL and Eagle Games SH.A v. Republic of Albania (ICSID Case No. ARB/11/18) | Procedural Order No. 2 (Provisional Measures Concerning Security for Costs) (English) | May 3, 2012 | Rejected |
Vigotop Limited v. Hungary (ICSID Case No. ARB/11/22) | Award (English) | October 1, 2014 | Not decided (see Award) |
OI European Group B.V. v. Bolivarian Republic of Venezuela (ICSID Case No. ARB/11/25) | Decision on Provisional Measures (Spanish) | November 26, 2013 | Rejected (see Award) |
Tethyan Copper Company Pty Limited v. Islamic Republic of Pakistan (ICSID Case No. ARB/12/1) | Decision on Claimant's Request for Provisional Measures (English) | December 13, 2012 | _ |
Muhammet Çap & Sehil Inşaat Endustri ve Ticaret Ltd. Sti. v. Turkmenistan (ICSID Case No. ARB/12/6) | Procedural Order No. 6 (English) | February 9, 2016 | _ |
Muhammet Ҫap & Bankrupt Sehil Inşaat Endustri ve Ticaret Ltd. Sti. v. Turkmenistan (ICSID Case No. ARB/12/6) | Decision on provisional measures (English) | December 13, 2018 | _ |
Lao Holdings N.V. v. Lao People's Democratic Republic (ICSID Case No. ARB(AF)/12/6 | Decision on Claimant's Amended Application for Provisional Measures (English) | September 17, 2013 | Partial (see Decision on Jurisdiction) |
Lao Holdings N.V. v. Lao People's Democratic Republic (ICSID Case No. ARB(AF)/12/6 | Ruling on Motion to Amend the Provisional Measures Order (English) | May 30, 2014 | Rejected |
Lao Holdings N.V. v. Lao People's Democratic Republic (ICSID Case No. ARB(AF)/12/6 | Decision on Claimant's Second application for Provisional Measures (English) | March 18, 2015 | _ |
Lao Holdings N.V. v. Lao People's Democratic Republic (ICSID Case No. ARB(AF)/12/6 | Decision on Claimant's Second application for Provisional Measures (English) | March 15, 2018 | _ |
RSM Production Corporation v. Saint Lucia (ICSID Case No. ARB/12/10) | Decision on St. Lucia's Request for Provisional Measures (English) | December 12, 2013 | Partial (see Decision on Saint Lucia's Request for Security for Costs with Assenting and Dissenting Reasons) |
RSM Production Corporation v. Saint Lucia (ICSID Case No. ARB/12/10) | Decision on St. Lucia's Request for Security for Costs (English) | August 13, 2014 | Granted |
Saint-Gobain Performance Plastics Europe v. Bolivarian Republic of Venezuela (ICSID Case No. ARB/12/13) | Procedural Order No. 3 (English) | September 9, 2014 | _ |
Churchill Mining PLC and Planet Mining Pty Ltd v. Republic of Indonesia (ICSID Case No. ARB/12/14 and 12/40) | Procedural Order No. 3 (English) | March 4, 2014 | Rejected |
Churchill Mining PLC and Planet Mining Pty Ltd v. Republic of Indonesia (ICSID Case No. ARB/12/14 and 12/40) | Procedural Order No. 9 (English) | July 8, 2014 | Rejected |
Churchill Mining PLC and Planet Mining Pty Ltd v. Republic of Indonesia (ICSID Case No. ARB/12/14 and 12/40) | Procedural Order No. 14 (English) | December 22, 2014 | Rejected |
Valle Verde Sociedad Financiera S.L. v. Bolivarian Republic of Venezuela (ICSID Case No. ARB/12/18) | Decision on Provisional Measures (English) | January 25, 2016 | Rejected |
Georg Gavrilovic and Gavrilovic d.o.o. v. Republic of Croatia (ICSID Case No. ARB/12/39) | Decision on Claimant's Urgent Application for Provisional Measures (English) | March 19, 2015 | _ |
Georg Gavrilovic and Gavrilovic d.o.o. v. Republic of Croatia (ICSID Case No. ARB/12/39) | Decision on Claimant's Urgent Application for Provisional Measures (English) | April 30, 2015 | _ |
Karkey Karadeniz Elektrik Uretim A.S. v. Islamic Republic of Pakistan (ICSID Case No. ARB/13/1) | Decision on Claimant's Request for Provisional Measures (English) | October 16, 2013 | _ |
Karkey Karadeniz Elektrik Uretim A.S. v. Islamic Republic of Pakistan (ICSID Case No. ARB/13/1) | Procedural Order No. 4 (English) | August 1, 2014 | _ |
Caratube International Oil Company LLP and Mr. Devincci Salah Hourani v. Republic of Kazakhstan (ICSID Case No. ARB/13/13) | Decision on the Claimant's Request for Provisional Measures (English) | December 4, 2014 | Rejected |
EVN AG v. Republic of Bulgaria (ICSID Case No. ARB/13/17) | Procedural Order No. 2 (English) | May 5, 2014 | _ |
Interocean Oil Development Company and Interocean Oil Exploration Company v. Federal Republic of Nigeria (ICSID Case No. ARB/13/20) | Procedural Order No. 6 (English) | February 1, 2017 | _ |
Marfin Investment Group Holdings S.A., Alexandros Bakatselos and others v. Republic of Cyprus (ICSID Case No. ARB/13/27) | Procedural Order No. 3 (English) | June 9, 2016 | _ |
Marfin Investment Group Holdings S.A., Alexandros Bakatselos and others v. Republic of Cyprus (ICSID Case No. ARB/13/27) | Procedural Order No. 7 (English) | November 7, 2016 | _ |
Transglobal Green Energy, LLC and Transglobal Green Energy de Panama, S.A. v. Panama (ICSID Case No. ARB/13/28) | Decision on the Respondent's Request for Provisional Measures Relating to Security for Costs (English) | January 21, 2016 | Rejected |
MOL Hungarian Oil and Gas Company Plc v. Republic of Croatia (ICSID Case No. ARB/13/32) | Decision on Respondent's Application under ICSID Arb. Rule 41(5) (English) | December 2, 2014 | Rejected |
PNG Sustainable Development Program Ltd. v. Independent State of Papua New Guinea (ICSID Case No. ARB/13/33) | Decision on the Claimant's Request for Provisional Measures (English) | January 21, 2015 | Partial |
Fouad Alghanim & Sons Co. for General Trading & Contracting, W.L.L. and Mr. Fouad Mohammed Thunyan Alghanim v. Hashemite Kingdom of Jordan (ICSID Case No. ARB/13/38) | Procedural Order No. 2 - Order on Application for the Grant of Provisional Measures with Dissenting Statement by Prof. Kohen (English) | November 24, 2014 | Granted |
Highbury International AVV, Compañía Minera de Bajo Caroní AVV, and Ramstein Trading Inc. c. Bolivarian Republic of Venezuela (ICSID Case No. ARB/14/10) | Decision Sobre la Solicitud de Medidas Provisionales (Spanish) | September 24, 2015 | _ |
EuroGas Inc. and Belmont Resources Inc. v. Slovak Republic (ICSID Case No. ARB/14/14) | Procedural Order No. 3 - Decision on Provisional Measures (English) | June 23, 2015 | Rejected |
EuroGas Inc. and Belmont Resources Inc. v. Slovak Republic (ICSID Case No. ARB/14/14) | Procedural Order No. 7 (English) | September 5, 2016 | Rejected |
Bear Creek Mining Corporation v. Republic of Peru (ICSID Case No. ARB/14/21) | Procedural Order No. 2 - Decision on Provisional Measures (English) | April 19, 2015 | Rejected |
BSG Resources Limited, BSG Resources (Guinea) Limited and BSG Resources (Guinea) SARL v. Republic of Guinea (ICSID Case No. ARB/14/22) | Procedural Order No. 3 (French & Spanish) | November 25, 2015 | Partial |
Tamagot Bumi S.A. and Bumi Mauritania S.A. v. Islamic Republic of Mauritania (ICSID Case No. ARB/14/23) | Procedural Order No. 4 (French) | September 19, 2016 | _ |
United Utilities (Tallinn) B.V. and Aktsiaselts Tallinna Vesi v. Republic of Estonia (ICSID Case No. ARB/14/24) | Decision - Respondent's Application for Provisional Measures (English) | May 12, 2016 | Partial |
Alpiq AG v. Romania (ICSID Case No. ARB/14/28) | Procedural Order No. 4 | September 10, 2017 | - |
Alpiq AG v. Romania (ICSID Case No. ARB/14/28) | Procedural Order No. 5 | September 21, 2017 | - |
Alpiq AG v. Romania (ICSID Case No. ARB/14/28) | Procedural Order No. 6 | December 6, 2017 | - |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/14/29) | Decision on Claimants' Application for Provisional Measures (English) | March 1, 2016 | _ |
Ioan Micula, Viorel Micula and others v. Romania (ICSID Case No. ARB/14/29) | Further decision on provisional measures (English) | March 15, 2018 | _ |
Strabag SE v. Libya (ICSID Case No. ARB(AF)/15/1) | Decision on Provisional Measures | October 31, 2017 | Rejected (see the Award of the Tribunal) |
Lighthouse Corporation Pty Ltd and Lighthouse Corporation Ltd, IBC v. Democratic Republic of Timor-Leste (ICSID Case No. ARB/15/2) | Procedural Order No. 2 - Decision on Respondent's Application for Provisional Measures (English) | February 13, 2016 | _ |
Aktau Petrol Ticaret A.Ş. v. Republic of Kazakhstan (ICSID Case No. ARB/15/8) | Procedural Order No. 5 | January 27, 2017 | - |
Álvarez y Marín Corporación S.A. and others v. Republic of Panama (ICSID Case No. ARB/15/14) | Procedural Order No. 11 | July 12, 2017 | - |
Menzies Middle East and Africa S.A. et Aviation Handling Services International Ltd. v. Senegal (ICSID Case No. ARB/15/21) | Procedural Order No. 2 (French) | December 2, 2015 | Partial |
Hydro S.r.l. and others v. Republic of Albania (ICSID Case No. ARB/15/28) | Procedural Order on Provisional Measures (English) | March 3, 2016 | Partial |
Samsung Engineering Co., Ltd. v. Sultanate of Oman (ICSID Case No. ARB/15/30) | Decision on Claimant's Request for Provisional Measures (English) | December 9, 2016 | _ |
Gabriel Resources Ltd. and Gabriel Resources (Jersey) Ltd. v. Romania (ICSID Case No. ARB/15/31) | Decision on Claimants' Second Request for Provisional Measures (English) | November 22, 2016 | _ |
B.V. Belegging-Maatschappij "Far East" v. Republic of Austria (ICSID Case No. ARB/15/32) | Decision on Bifurcation & Decision on Provisional Measures (English) | June 20, 2016 | _ |
Eskosol S.p.A. in liquidazione v. Italian Republic (ICSID Case No. ARB/15/50) | Procedural Order No. 3 (English) | April 12, 2017 | Rejected |
Al Jazeera Media Network v. Arab Republic of Egypt (ICSID Case No. ARB/16/1) | Decision on Claimant’s Request for Provisional Measures (English) | October 26, 2017 | _ |
Luis García Armas v. Bolivarian Republic of Venezuela (ICSID Case No. ARB(AF)/16/1) | Procedural Order No. 8 (Spanish) | June 20, 2018 | _ |
Champion Holding Company and others v. Arab Republic of Egypt (ICSID Case No. ARB/16/2) | Procedural Order No. 11 | July 18, 2019 | - |
Veolia Environnement S.A. and others v. Republic of Lithuania (ICSID Case No. ARB/16/3) | Procedural Order No. 13 | December 18, 2020 | - |
Veolia Environnement S.A. and others v. Republic of Lithuania (ICSID Case No. ARB/16/3) | Procedural Order No. 15 | April 19, 2024 | - |
JSC Tashkent Mechanical Plant and others v. Kyrgyz Republic (ICSID Case No. ARB(AF)/16/4) | Procedural Order No. 3 (English) | July 22, 2020 | _ |
Italba Corporation v. Oriental Republic of Uruguay (ICSID Case No. ARB/16/9) | Decision on Claimant's Application for Provisional Measures and Temporary Relief (English) | February 15, 2017 | Rejected |
Alhambra Resources Ltd. and Alhambra Coӧperatief U.A. v. Republic of Kazakhstan (ICSID Case No. ARB/16/12) | Procedural Order No. 2 (English) | November 9, 2016 | _ |
Alhambra Resources Ltd. and Alhambra Coӧperatief U.A. v. Republic of Kazakhstan (ICSID Case No. ARB/16/12) | Procedural Order No. 3 (English) | February 23, 2017 | _ |
Nova Group Investments, B.V. v. Romania (ICSID Case No. ARB/16/19) | Procedural Order No. 7 (English) | March 29, 2017 | _ |
Prime Energy Resources Development B.V. (formerly Shell Philippines Exploration B.V.) v. Republic of the Philippines (ICSID Case No. ARB/16/22) | Decision on Provisional Measures (English) | August 29, 2017 | _ |
Prime Energy Resources Development B.V. (formerly Shell Philippines Exploration B.V.) v. Republic of the Philippines (ICSID Case No. ARB/16/22) | Procedural Order No. 8 (English) | August 24, 2020 | _ |
Prime Energy Resources Development B.V. (formerly Shell Philippines Exploration B.V.) v. Republic of the Philippines (ICSID Case No. ARB/16/22) | Procedural Order No. 10 (English) | April 1, 2021 | _ |
Emergofin B.V. and Velbay Holdings Ltd. v. Ukraine (ICSID Case No. ARB/16/35) | Decision on the Claimants' Request for Provisional Measures (English) | December 5, 2017 | _ |
Itisaluna Iraq LLC and others v. Republic of Iraq (ICSID Case No. ARB/17/10) | Interim Order on Provisional Measures (English) | January 11, 2018 | _ |
Itisaluna Iraq LLC and others v. Republic of Iraq (ICSID Case No. ARB/17/10) | Order Vacating the Interim Order on Provisional Measures (English) | January 31, 2018 | _ |
Lidercón, S.L. v. Republic of Peru, (ICSID Case No. ARB/17/9) | Decision on the Claimants' Request for Provisional Measures (English) | May 31, 2019 | Rejected (see Award of the Tribunal) |
Jochem Bernard Buse v. Republic of Panama (ICSID Case No. ARB/17/12) | Decision on Provisional Measures and Production of Documents (English) | December 30, 2017 | _ |
Grenada Private Power Limited and WRB Enterprises, Inc. v. Grenada (ICSID Case No. ARB/17/13) | Decision on Provisional Measures (English) | September 26, 2018 | Granted |
Grenada Private Power Limited and WRB Enterprises, Inc. v. Grenada (ICSID Case No. ARB/17/13) | Procedural Order No. 2 (English) | July 20, 2018 | Granted (see Award of the Tribunal) |
Hela Schwarz GmbH v. People's Republic of China (ICSID Case No. ARB/17/19) | Procedural Order No. 2 (English) | August 10, 2018 | Rejected |
Bursel Tekstil Sanayi Ve Diş Ticaret A.Ş., Burhan Enuştekin and Selim Kaptanoğlu v. Republic of Uzbekistan (ICSID Case No. ARB/17/24) | Decision on Preliminary Objections and Provisional Measures (English) | April 22, 2020 | _ |
AS Norvik Banka and others v. Republic of Latvia (ICSID Case No. ARB/17/47) | Ruling on Power of Tribunal to Issue Provisional Measures Whilst Proceedings are Suspended (English) | September 24, 2018 | Rejected |
AS PNB Banka and others v. Republic of Latvia (ICSID Case No. ARB/17/47) | Decision on provisional measures (English) | April 17, 2019 | _ |
AGRAND EXPRESS Non-Public Joint Stock Company v. Republic of Belarus (ICSID Case No. ARB(AF)/18/1) | Procedural Order No. 4 (English) | December 28, 2020 | _ |
Rand Investments Ltd. and others v. Republic of Serbia (ICSID Case No. ARB/18/8) | Procedural Order No. 9 (English) | March 12, 2021 | Rejected |
Ipek Investment Limited v. Republic of Turkey (ICSID Case No. ARB/18/18) | Procedural Order No. 5 (English) | September 19, 2019 | _ |
African Petroleum Senegal Limited v. Republic of Senegal (ICSID Case No. RB/18/24) | Procedural Order No. 2 (French) | April 26, 2019 | _ |
Alverley Investments Limited and Germen Properties Ltd v. Romania (ICSID Case No. ARB/18/30) | Decision on provisional measures (English) | August 1, 2019 | _ |
Legacy Vulcan v. United Mexican States (ICSID Case No. ARB/19/1) | Procedural Order No. 7 (English) | July 11, 2022 | Granted |
Nationale-Nederlanden Holdinvest B.V. and others v. Argentine Republic (ICSID Case No. ARB/19/11) | Decision on Provisional Measures (English) | June 21, 2021 | _ |
Axiata Investments (UK) Limited and Ncell Private Limited v. Nepal (ICSID Case No. ARB/19/15) | Decision on Provisional Measures (English) | December 18, 2019 | _ |
DSG Yapi Sanayi Ticaret Anonim Sirketi v. Kingdom of Saudi Arabia (ICSID Case No. ARB/19/32) | Procedural Order No. 2 (English) | July 17, 2020 | _ |
Gerald International Limited v. Republic of Sierra Leone (ICSID Case No. ARB/19/31) | Procedural Order No. 2 (English) | July 28, 2020 | Rejected |
DSG Yapi Sanayi Ticaret Anonim Sirketi v. Kingdom of Saudi Arabia (ICSID Case No. ARB/19/32) | Procedural Order No. 2 (English) | July 17, 2020 | _ |
Amec Foster Wheeler USA Corporation, Process Consultants, Inc., and Joint Venture Foster Wheeler USA Corporation and Process Consultants, Inc. v. Republic of Colombia (ICSID Case No. ARB/19/34) | Procedural Order No. 3 (English & Spanish) | May 31, 2022 | Rejected |
United Agencies Limited SA v. People’s Democratic Republic of Algeria (ICSID Case No. ARB/20/1) | Procedural Order No. 5 (English) | April 3, 2021 | _ |
BRIF TRES d.o.o. Beograd and BRIF-TC d.o.o. Beograd v. Republic of Serbia (ICSID Case No. ARB/20/12) | Procedural Order No. 2 (English) | January 26, 2021 | _ |
BRIF TRES d.o.o. Beograd and BRIF-TC d.o.o. Beograd v. Republic of Serbia (ICSID Case No. ARB/20/12) | Procedural Order No. 3 (English) | February 9, 2021 | _ |
Espíritu Santo Holdings, LP and L1bre Holding, LLC v. United Mexican States (ICSID Case No. ARB/20/13) | Procedural Order No. 3 (English) | June 3, 2022 | _ |
Kansanshi Mining Plc v. Republic of Zambia (ICSID Case No. ARB/20/17) | Procedural Order No. 2 (English) | August 12, 2021 | _ |
Teyliom International et al. v. Republic of Benin (ICSID Case No. ARB/20/24) | Decision on Provisional Measures (English) | June 30, 2022 | _ |
Nasib Hasanov v. Georgia (ICSID Case No. ARB/20/44) | Decision on the Claimant´s Application for Provisional Measures (English) | June 14, 2022 | Granted |
Ahron G. Frenkel v. Republic of Croatia (ICSID Case No. ARB/20/49) | Procedural Order No. 3 (English) | November 28, 2022 | _ |
Bachar Kiwan v. State of Kuwait (ICSID Case No. ARB/20/53) | Procedural Order No. 2 (English) | December 24, 2021 | _ |
RWE AG and RWE Eemshaven Holding II BV v. Kingdom of Netherlands (ICSID Case No. ARB/21/4) | Decision on the Claimant´s Request for Provisional Measures (English) | August 16, 2022 | _ |
VINCI Highways SAS and VINCI Concessions SAS v. Republic of Peru (ICSID Case No. ARB/21/60) | Procedural Order No. 2 (English) | November 15, 2022 | _ |
Telefónica, S.A. c. República del Perú (ICSID Case No. ARB/21/10) | Decision on the Claimant’s Request for Provisional Measures | July 7, 2023 | _ |
First Majestic Silver Corp. v. United Mexican States (ICSID Case No. ARB/21/14) | Decision on the Claimant’s Request for Provisional Measures | May 26, 2023 | _ |
Sanitek S.a.r.l., Sari Haddad and Elias Doumet v. Republic of Armenia (ICSID Case No. ARB/21/17) | Procedural Order No. 3 | August 23, 2023 | _ |
Uniper SE, Uniper Benelux Holding B.V. and Uniper Benelux N.V. v Kingdom of the Netherlands (ICSID Case No. ARB/21/22) | Procedural Order No. 2 (English) | May 9, 2022 | Partial |
Finley Resources, Inc., MWS Management, Inc., and Prize Permanent Holdings, LLC v. United Mexican States (ICSID Case No. ARB/21/25) | Decision on provisional measures (English) | January 26, 2022 | _ |
Mainstream Renewable Power Ltd and others v. Federal Republic of Germany (ICSID Case No. ARB/21/26) | Procedural Order No. 8 (English) | July 17, 2023 | Rejected |
Alpene Ltd. v. Republic of Malta (ICSID Case No. ARB/21/36) | Decision on provisional measures (English) | November 15, 2022 | _ |
Alpene Ltd. v. Republic of Malta (ICSID Case No. ARB/21/36) | Procedural Order No. 4 | July 11, 2023 | _ |
VINCI Highways SAS and VINCI Concessions SAS v. Republic of Peru (ICSID Case No. ARB/21/60) | Procedural Order No. 2 (English) | September 14, 2022 | _ |
KrisEnergy Bangladesh Limited v. People's Republic of Bangladesh and Bangladesh Oil Gas and Mineral Corporation (ICSID Case No. ARB/22/4) | Decision on provisional measures (English) | June 24, 2022 | _ |
KrisEnergy Bangladesh Limited v. People's Republic of Bangladesh and Bangladesh Oil Gas and Mineral Corporation (ICSID Case No. ARB/22/4) | Second Decision on Provisional Measures and Clarification of the 2022 Decision | July 10, 2023 | _ |
RTI Rotalin Gas Trading AG and Rotalin Gaz Trading S.R.L. v. Republic of Moldova (ICSID Case No. ARB(AF)/22/4) | Procedural Order No. 3 | December 11, 2023 | _ |
RTI Rotalin Gas Trading AG and Rotalin Gaz Trading S.R.L. v. Republic of Moldova (ICSID Case No. ARB(AF)/22/4) | Procedural Order No. 6 | July 15, 2024 | Granted in part |
WOC Photovoltaik Portfolio GmbH & Co. KG and others v. Kingdom of Spain (ICSID Case No. ARB/22/12) | Decision on the Claimant's Application for Provsional Measures | May 3, 2023 | _ |
Tayeb Benabderrahmane v. State of Qatar (ICSID Case No. ARB/22/23) | Procedural Order No. 5 | December 20, 2023 | _ |
Tayeb Benabderrahmane v. State of Qatar (ICSID Case No. ARB/22/23) | Procedural Order No. 7 | July 31, 2024 | _ |
Libra LLC and others v. Republic of Azerbaijan (ICSID Case No. ARB/23/46) | Decision on the Claimant's Request for Provisional Measures | July 8, 2024 | _ |
Klesch Group Holdings Limited and Raffinerie Heide GmbH v. Federal Republic of Germany (ICSID Case No. ARB/23/49) | Decision on Provisional Measures | July 23, 2024 | _ |